Aqua One Shades 2+2 Cabinet Instrukcja montażu - Strona 17

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Wyposażenie wnętrz Aqua One Shades 2+2 Cabinet. Aqua One Shades 2+2 Cabinet 20 stron.

This unit must be fixed to a wall using the
Step 32
2 Overbalance Protector Kits provided
Secure the unit to a
wall
a:
Before fitting the unit
to a wall, use a Spirit
a:
Level to check the Top of
the unit is level,
front-to-back and
side-to-side in the 3
positions shown.
Use suitable packing
pieces (not supplied) to
make the unit level.
Top
To prevent possible
b:
R
R
overbalancing this unit
must be secured to a
suitable wall by fitting the
2 Overbalance Protector
Kits to a wall.
b:
Push the unit up
against the wall and slide
the Brackets against the
R
wall. Fit the 2nd Screw
from the kits into the
underside of the Top
panel.
R
Mark the slot at the back
of the Brackets for drilling
into the wall.
Wall fixings are not
supplied as they will need
to suit the wall type.
Take care when drilling
the wall that you do not
drill into any pipes, wires
etc. If in doubt, consult an
expert.