Allied Telesis AT-PB206 Podręcznik szybkiej instalacji - Strona 2
Przeglądaj online lub pobierz pdf Podręcznik szybkiej instalacji dla Przełącznik Allied Telesis AT-PB206. Allied Telesis AT-PB206 2 stron. Fast ethernet switches
10/100Base-TX
Model
Connector
Maximum Distance
AT-PB205
RJ-45
100 m (328 ft)
AT-PB206
RJ-45
100 m (328 ft)
AT-PB207
RJ-45
100 m (328 ft)
1. Maximum distance can only be obtained when the UTP/STP cabling is installed and verified to TIA/EIA 568A Commercial Building
Telecommunications Cabling Standard.
2. Maximum distance for 100 Mbps Optical Datalinks is dependent on the following factors: type of optical fiber, duplex mode of both
end-nodes, and maximum optical loss budget for each of the optical fiber at the operating optical wavelength.
The following table lists the cable specifications for the 100Base-FX fiber optic port
when operating in full-duplex mode.
Model
Cable
AT-PB201
50/125 or 62.5/125 micron
AT-PB202
multimode
AT-PB204
AT-PB205
AT-PB206
AT-PB207
AT-PB202/1
50/125 or 62.5/125 multimode
9/125 micron single-mode
AT-PB202/2
9/125 micron single-mode
AT-PB202/3
9/125 micron single-mode
AT-PB202/4
9/125 micron single-mode
The following table lists the cabling specifications for the 10/100Base-TX twisted pair
port when operating in full-duplex mode.
Operating Mode
Cable
10Base-T
Shielded or unshielded Category 3 or better
100Base-TX
Shielded or unshielded Category 5 or better
Cable specifications for half-duplex operation and fiber optic port specifications can be
found in the PowerBlade Chassis Installation Guide.
Package Contents
Make sure the following items are included in your package. If any item is missing or
damaged, contact your Allied Telesyn sales representative for assistance.
One AT-PB200 Series Switch Module
This quick install guide
Warranty card
2
100Base-FX
1
2
Connector
Maximum Distance
VF-45
2 km (1.2 mi)
LC
2 km (1.2 mi)
FJ
2 km (1.2 mi)
Maximum Allowable
Maximum Distance
Loss Budget
2 km (1.2 mi)
13 dB at 1310 nm
2 km (1.2 mi)
13 dB at 1310 nm
15 km (9.3 mi)
16 dB at 1310 nm
40 km (24.8 mi)
30 dB at 1310 nm
70 km (43.4 mi)
37 dB at 1310 nm
100 km (62 mi)
37 dB at 1310 nm
Maximum Distance
100 m (328 ft)
100 m (328 ft)
Installing a Switch
1. Remove a blank faceplate from an empty expansion slot on the front of the chassis.
The module can be installed in any slot.
2. Remove the module from the shipping package and store the packaging material in
a safe place. Be sure to observe standard ESD precautions.
3. Check the setting of the J6 jumper. If the chassis does not contain an AT-PBM02
management module, set the jumper to the Enabled (RIGHT) position. Refer to the
PowerBlade Chassis Installation Guide for the jumper location.
4. For the twisted pair port, set the AUTO NEG switch to either ON or OFF to enable
or disable the auto-negotiation on the port. Refer to the PowerBlade Chassis
Installation Guide for the location of the Auto-negotiation switch.
5. Set the DIP switches to the appropriate settings. Refer to the PowerBlade Chassis
Installation Guide for possible DIP switch settings.
6. Slide the module into the expansion slot, aligning it with the guiderails until it
firmly connects to the chassis' backplane.
7. Secure the module to the chassis by tightening the thumbscrew.
8. Verify that the PR LED on the switch is green. If the LED is OFF, refer to the
PowerBlade Chassis Installation Guide for troubleshooting instructions.
9. Remove the dust cover from the fiber optic port and connect the fiber optic cable to
the 100Base-FX port. Verify that the module's transmitter port (TX) is connected to
the end-node's receiver port (RX) and that the module's receiver port (RX) is
connected to the end-node's transmitter port (TX).
10. Connect the twisted pair cable to the 10/100Base-TX twisted pair port.
11. Set the MDI/MDI-X button to the appropriate setting. Refer to the PowerBlade
Chassis Installation Guide for additional information on the MDI/MDI-X button.
12. Power ON the end-nodes.
13. Check that the LK/AT LED for both ports on the module are green. If the LEDs are
OFF, refer to PowerBlade Chassis Installation Guide for troubleshooting
instructions.
14. The module is now ready for use. Repeat this procedure to install additional
AT-PB200 Series modules.
Refer to the PowerBlade Chassis Installation Guide for additional information.
Status LEDs
LED
Color
Description
PR
Green
Power is applied to the switch.
LK/AT
Green
A link has been established on the port.
Blinking
Data is being transmitted or received on the port.
100M
Green
The port is operating at 100 Mbps.
OFF
The port is operating at 10 Mbps.
FD
Green
The switch is operating in full-duplex mode.
OFF
The switch is operating in half-duplex mode.
AUTO
Green
The 10/100Base-TX port is auto-negotiating.
3