Dell Force10 S2410-01-10GE-24P Skrócona instrukcja obsługi - Strona 10
Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Serwer Dell Force10 S2410-01-10GE-24P. Dell Force10 S2410-01-10GE-24P 31 stron. Installing the s2410 system
Również dla Dell Force10 S2410-01-10GE-24P: Nota aplikacyjna (6 strony), Podręcznik (42 strony)
CAUTION: The power supply cord is used as the main disconnect device;
ensure that the socket-outlet is located/installed near the equipment and is
easily accessible.
Both S2410 models (S2410CP and S2410P) provide built-in dual AC power
supplies. Ideally, the power sources would be on separate circuits. While only
one power supply is needed for the unit to operate, if both power supplies are
connected, the power supplies act as redundant backups and do some load
sharing, although the sharing is not necessarily equal.
There are no DC power or backup power options.
Step
Task
Connect the power cord plugs to the AC receptacles at each rear corner
1
of the S2410. Make sure that the cords are secure.
Connecting either power cord to power starts the system. There is no
2
on/off switch.
Fans
Fan replacement is not offered as an option in the field.
Ventilation is primarily side-to-side (some vents in back), with seven fans on the
left side of the switch that operate at a constant speed.
6
Installing the Hardware
Dual AC Power Receptacles
NOTE: The AC receptacles are labeled A and B, matched to the
PSU A and PSU B status LEDs on the face of the S2410. Labeling
the power cords A and B can help in a diagnostic situation.
Vents