Dell Force10 S50N Series Skrócona instrukcja obsługi - Strona 8
Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Serwer Dell Force10 S50N Series. Dell Force10 S50N Series 25 stron. Rapid equallogic configuration series configuration introduction array: ps4100 host: vmware esxi
Również dla Dell Force10 S50N Series: Podręcznik wdrażania (9 strony)
Step
Task
Dell Force10 recommends that one person hold the chassis in place
1
while a second person attaches the brackets to the posts.
Attach the bracket "ears" to the rack or cabinet posts, using two screws
2
for each bracket. Ensure the screws are tightened firmly.
Attach a Ground Cable to the S50N and S50V Chassis
The S50V and S50N switches have both AC (3-prong plug receptacle) and DC
(-48V terminal-type) connections on the back of the unit. They can use either
power source independently or in combination, with the DC source in a backup
mode (except for the 470W DC power supply). If you select AC and DC, the
switch will only use the DC source after the AC source fails.
NOTE: The rack installation ears are not suitable for grounding.
CAUTION: Grounding conductors must be made of copper. Do not use
aluminum conductors.
NOTE: Coat the one-hole lug with an anti-oxidant compound prior to crimping.
Bring any un-plated mating surfaces to a shiny finish, and coat with an anti-oxidant
prior to mating. Plated mating surfaces must be clean and free from contamination.
Attach a Ground Cable to the S50N-DC Chassis
The S50N-DC switches have two terminal blocks on the right side (instead of an
AC receptacle) for two DC power supply inputs. The terminal block on the
right, as you face the back of the chassis, is matched to the DC1 status LED on
the front left of the switch and the left block is matched to the DC2 status LED.
6
Installing the Hardware