Dell PowerEdge 6x00 Series Instalacja stojaka - Strona 31
Przeglądaj online lub pobierz pdf Instalacja stojaka dla Serwer Dell PowerEdge 6x00 Series. Dell PowerEdge 6x00 Series 34 stron. Rack installation guide
Również dla Dell PowerEdge 6x00 Series: Instalacja stojaka (37 strony), Instrukcja instalacji (37 strony)
(Rev. 9/8/00) FILE LOCATION: S:\SYSTEMS\MARCONI\Rackingd\7U\05KCEa00\05KCEeb0.fm
support.dell.com
Reversing the Cable-Management Arm Installation
1.
Turn the cable-management arm over (see Figure 13).
pull pin
offset
hinge
rail-mounting
plate
Figure 13. Reversing the Cable-Management Arm
2.
Remove the pull pins from the offset hinge of the cable-management arm.
3.
Remove the rail-mounting plate.
NOTE: Make note of the orientation of the rail-mounting plate to the vertical rail.
4.
Pull the hinge away from the cable-management arm assembly.
5.
Position the offset hinge next to the cable-management arm assembly.
6.
Replace the pull pin with the ring facing up.
7 .
Replace the rail-mounting plate in the same orientation to the opposite vertical
rail.
8.
Replace the second pull pin with the ring facing up.
9.
Perform the steps to install the cable-management arm. The opposite vertical rail
and the slotted pocket on the opposite side of the cable tray are used for reverse
the installation of the cable-management arm.
DELL CONFIDENTIAL - Preliminary
latch pin
9/8/00
Rack Installation Guide
17