EarthLinked AVS - 6800-V Instrukcja instalacji - Strona 2
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Oczyszczacz powietrza EarthLinked AVS - 6800-V. EarthLinked AVS - 6800-V 16 stron. Air handlers avs series r-410a and r-407c heat only systems
Proper installation and service of EarthLinked
essential to reliable performance. All EarthLinked
an authorized, trained technician who has successfully completed the training class and passed
the final examination. Installation and service must be made in accordance with the instructions set
forth herein and in the system installation manual. Failure to provide installation and service by an
authorized, trained installer in a manner consistent with the subject manual will nullify the limited
warranty coverage for the system.
READ THE SYSTEM INSTALLATION MANUAL FOR ADDITIONAL DETAILS.
Earthlinked Technologies shall not be liable for any defect, unsatisfactory performance, damage or
loss, whether direct or consequential, relative to the design, manufacture, construction, application
or installation of the field specified components.
AVS-H-IM (03/13)
Disclaimer
®
Earthlinked Technologies, Inc.
4151 South Pipkin Road
Lakeland, Florida 33811
tel. 863-701-0096 ● fax 863-701-7796
CSI # 23 80 00
Heating and Cooling System Components is
®
components must be installed and serviced by
www.earthlinked.com
Page 2