360 Hunting Blinds SHANTY HUNTER Instrukcja montażu - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Zestaw do szklarni 360 Hunting Blinds SHANTY HUNTER. 360 Hunting Blinds SHANTY HUNTER 8 stron.
STEP 7
HOIST THE ROOF
Lift the roof to the top of the blind and
rest it on the walls. Balance it on the
rear walls far enough to have room to
install the fi nal wall panel and door
panel.
STEP 8
INSTALL THE DOOR PANEL
With the roof in place, it's fi nally time
to install the door. Get the door close
to the blind, have one person hold the
panel while another person applies
caulk to wall panels. Then set the door
panel in place and fasten like the other
wall panels. Screws that go into the
fl oor may have to be removed to move
walls into place and get a tighter seal.
360HUNTINGBLINDS.COM
PAGE 6