ALLIMEX SolarSpeed Instrukcja montażu - Strona 9

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Panel słoneczny ALLIMEX SolarSpeed. ALLIMEX SolarSpeed 15 stron. East-west facing landscape

INSTALLATION
6. PLACEMENT BALLAST: L-PROFILES
Set ballast L-profiles
+ support
The ballast for an E-W set-up is placed on a set of
L-profiles. This has the advantage of an extra con-
nection which makes the construction as a whole
even stronger.
ATTENTION! If possible, try to position the ballast
tiles as close to the base units as possible.
When installing on concrete bases, a higher central
support is provided to support the L-profiles.
Plate screws
In arrangements where the system is placed on So-
lar PP supports, the central support should also be
placed on PP supports. An indication of the neces-
sary ballast, the placing and the way of ballasting
can be calculated with the free online software.
Ballast tile
(provided by customer)
8