Christie 104-007101-XX Instrukcja instalacji - Strona 8
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Akcesoria do projektorów Christie 104-007101-XX. Christie 104-007101-XX 12 stron. Stacking frames

Stacking Frame Installation Instructions
H
oisting via Roadster/Mirage S+/Roadster HD12K Hardware
When hoisting a stack combining Roadster/Mirage S+ and Roadster HD12K
models with any of the models listed in Table 1 use the hardware on the
Roadster/Mirage S+ and Roadster HD12K models to hoist the stack.
The four top rigging points have a maximum loading capacity of 800 lbs. each.
When hoisting from the bottom of the projector use at least four of the eight
rigging points (two opposite sets). Use metric hardware only (M12 thread).
Figure 5. Hoisting via Roadster/Mirage S+/Roadster HD12K Hardware
013-100342-01 (Rev.1) (08/06)
WARNING
WARNING
8 of 12 pages