360 Yield 360 Y-DROP CASE 120 BOOM Instrukcja obsługi - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Sprzęt rolniczy 360 Yield 360 Y-DROP CASE 120 BOOM. 360 Yield 360 Y-DROP CASE 120 BOOM 10 stron.

INSTALL MOUNT ASSEMBLIES
II.
ON THE OEM PRIMARY BOOM
Figure 4
Figure 4 shows size and location of U-bolts for
OEM primary boom. The opposite arm of the
central section will follow the same pattern as
the arm shown.
Figure 5
Step 1
With the threads pointing up, install
U-bolt (1) on the bottom side of the OEM
primary boom.
Bag AK (3.5")
Bag AJ (3.0")
Bag AH (2.5")
Bag AS (6.0" Top Plate)
NOTE:
An example of the first mounting location
is illustrated in the callout in Figure 4.
Step 2
Install bracket assembly (2) and flange
lock nut (3).
Hardware Kit D
Repeat Steps 1 and 2 for the other OEM mount
bracket kit.
Step 3
Install extension tube (4).
Step 4
Install boom bracket (5) onto the
extension tube.
Step 5
Install stop bolts (6) at both the front
and the rear of the extension tube.
Hardware Kit B
Figure 6
Shows the positioning for the strap (1) and two 3/8"
bolts and flange nuts (2) used for the OEM mount
bracket on the outside mount of the primary boom.
Figure 7
Step 6
Install stainless steel set screw and jam
nut assembly (1).
Hardware Kit D
Repeat Steps 1-6 for the remaining mount
assemblies on the OEM primary boom.
INSTRUCTIONS 360 Y-DROP
Front of Machine
Figure 4
6
5
Figure 5
1
Figure 6
1
Figure 7
360YIELDCENTER.COM
CASE 120' BOOM
2
3
4
1
2
1
4