Miele Ventilation System Instrukcja obsługi i instalacji - Strona 28
Przeglądaj online lub pobierz pdf Instrukcja obsługi i instalacji dla Okap wentylacyjny Miele Ventilation System. Miele Ventilation System 32 stron. Ventilation system
Installation
Installation accessories
4 screws 5 x 60 mm and
4 anchors 8 x 50
for securing the ventilation hood to the
ceiling.
,
The screws and anchors are
suitable for mounting on concrete
ceilings.
For other types of ceiling materials,
use appropriate materials.
Ensure that the ceiling can support
the load.
4 mounting sets
for hanging the ventilation hood on the
ceiling, consisting of 4 cables, 4 ceiling
fasteners und 4 caps.
,
The suspension must not be
used for additional components
(e.g. a shelf).
3 cord fasteners
for fastening the power cable to a
suspension cord.
28
1 strain relief
for affixing the power cable to a ceiling
fastener.
Drill template
A cardboard insert serves as a drill
template.
Installation instructions
The individual installation steps are
described on the installation sheet
provided.
Before installation, read the
information on the following pages
as well as "Appliance dimensions"
and "Important safety instructions".
,
CAUTION
To avoid risk of hand or other injury,
avoid contact with sharp edges
during the assembly and installation
process.
,
CAUTION
When cutting or drilling into the wall
or ceiling, do not damage electrical
wiring and other hidden utilities.