Miele KM 344 G Instrukcja instalacji - Strona 8
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Płyta grzewcza Miele KM 344 G. Miele KM 344 G 20 stron.
Również dla Miele KM 344 G: Instrukcja obsługi (24 strony)
![Miele KM 344 G Instrukcja instalacji](/uploads/products/server2/3449799/3449799.png)
Installation
Setting the cooktop into place
c
^ After removing the protective
backing, d, stick the supplied seal,
c, under the edge of the cooktop.
^ Screw the gas regulator onto the
nipple underneath the cooktop. (See
"Gas Connection - Gas pressure
regulator".)
^ Feed the power cord through the
cut-out to the power outlet.
^ Set the cooktop in the cut-out and
center it.
Install the appliance so that the
power cord and gas piping does not
come in contact with any portion of
the cooktop which may become hot
during use.
8
d
Securing the cooktop
^ Secure the cooktop with the included
fixing bracket.
13
Countertop
/
" (20 mm)
16
9
Countertop 1
/
" (40 mm)
16