ALLpaQ Packaging Group Genesis 500 Instrukcja obsługi dla operatora - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla operatora dla Sprzęt do pakowania ALLpaQ Packaging Group Genesis 500. ALLpaQ Packaging Group Genesis 500 13 stron.

ALLpaQ Packaging Group Genesis 500 Instrukcja obsługi dla operatora
1.5 Fitting the lid
One Operator
Hold the lid against the front panel (Fig 5.1). Simply lower the lid until it is located across all four
corners of the container (Fig 5.2). Always lock the lid to a fully erected container.
Fig 5.2
Fig 5.1
1.6 Moving the container to storage
Pallet base allows for four way entry provided the manual handling equipment used is either a
pallet jack or fork lift truck (See Fig 1.1 and 1.2 above).
Material handling equipment with forks lifting from the legs (Fig 6.2) ensure two way entry is used
when lifting from front or rear of the base.
Fig 6.2
Fig 6.1
1.7 Emptying the container
Move the container into position as described in point 1.6
1.8 Removing the lid
Please do not attempt to lift the lid using the red catches this will increase the risk of breakage.
Please refer to instruction 1.2
Manual V1 - (Sept 14
th
2012)