Miller WP-26FV Instrukcja obsługi - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Akcesoria spawalnicze Miller WP-26FV. Miller WP-26FV 28 stron.
B. Connecting Torch With Two-Piece Cable
.
If applicable, install high-frequency unit.
Torch Without Gas Valve
Torch With Gas Valve
Tools Needed:
11/16 in.
C. Connecting Torch With Flow-Through Type Connection
.
If applicable, install high-frequency unit.
Torch Without Gas Valve
Tools Needed:
11/16 in.
OM-225 428 Page 10
4
5
8
7
4
−
9 5
6
7
4
6
7
2
3
1
6
2
3
2
1
3
5
!
Turn Off welding power source
power before installing torch.
Obtain the following hose:
1
Gas Hose With 5/8-18 Right-
Hand Fittings
Connections:
2
Regulator/Flowmeter
3
Gas Cylinder
4
Welding Power Source
5
Torch Power Cable
6
Torch Gas-In Hose
7
Work Clamp
Connect work clamp to a clean, paint-
free location on workpiece, close to
weld area.
Use wire brush to clean weld joint
area.
8
Foot Control
9
Gas Valve
Valve controls gas preflow and post-
flow. Open valve on torch just before
welding.
Preflow is used to purge the immedi-
ate weld area of atmosphere.
Postflow is required to cool tungsten
and weld, and to prevent contamina-
tion of tungsten and weld. After weld-
ing, leave valve open about 1 second
for every 10 amperes of weld current.
Close valve on torch when postflow is
finished.
805 554-A
!
Turn Off welding power source
power before installing torch.
Obtain the following hose:
1
Gas Hose With 5/8-18 Right-
Hand Fittings
Connections:
2
Regulator/Flowmeter
3
Gas Cylinder
4
Welding Power Source
5
Gas Valve
Located on back of machine.
6
One-Piece Torch Cable
7
Work Clamp
Connect work clamp to clean, paint-
free location on workpiece, close to
weld area.
Use wire brush to clean metal at weld
joint area.
804 330-B