ABB E-Hub 2.0 Pierwsze kroki - Strona 11
Przeglądaj online lub pobierz pdf Pierwsze kroki dla Urządzenia przemysłowe ABB E-Hub 2.0. ABB E-Hub 2.0 18 stron.
P R O V I S I O N I N G S T E P S
10
Select the tile "Hub provisioning".
Select the tile "E-Hub 2.0" to start the configura-
tion of the unit.
In order to ensure that ABB Ability will work
properly, it is mandatory to follow these two
steps to check whether the system and the
device are configured in the right way
- System check
- Activate configuration session
Click "Go to discovery".