Miller Trailblazer 302 Diesel Podręcznik aplikacji - Strona 9
Przeglądaj online lub pobierz pdf Podręcznik aplikacji dla Falownik Miller Trailblazer 302 Diesel. Miller Trailblazer 302 Diesel 16 stron. Generator power
Również dla Miller Trailblazer 302 Diesel: Instrukcja obsługi (40 strony)
5. Selecting Generator Equipment
6. Grounding Generator To Truck Or Trailer Frame
Electrically bond generator
frame to vehicle frame by
metal-to-metal contact.
1
2
OR
2
3
GND/PE
1 Generator Power
Receptacles − Neutral
Bonded To Frame
2 3-Prong Plug From Case
Grounded Equipment
3 2-Prong Plug From Double
Insulated Equipment
Y Do not use 2-prong plug
unless
double insulated.
3
Ref. ST-159 730 / ST-800 577
Y Always ground gener-
ator frame to vehicle
frame to prevent elec-
tric shock and static
electricity hazards.
1 Metal Vehicle Frame
2 Equipment Grounding
Terminal
3 Grounding Cable
Use #10 AWG or larger insu-
lated copper wire.
Y If unit does not have
GFCI receptacles, use
GFCI-protected exten-
sion cord.
1
equipment
is
Be sure equipment
has this symbol
and/or wording.
S-0854
Page 5