Burlington AF1S Instrukcja instalacji - Strona 4
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Armatura łazienkowa Burlington AF1S. Burlington AF1S 6 stron. Avon thermostatic exposed shower valve outlet with fixed shower arm
Installation
HOT INLET
1
INLET PIPE
2
The valve should be installed in accordance with the water bye-laws. For further details refer to the latest copy of Water Bye-laws guide
or your local water authority.
Note: Please check for any hidden pipes and cables before drilling holes in the wall.
The fitting of isolation valves is required as close as is practicable to both hot and cold water supply inlets.
1. a: Determine the final installation position and installation height.
b: Prepare the water supply pipes (hot on the left and cold on the right) at the identified height with a width of 150mm centers.
Make the ends of pipes 20-25mm out from the face of wall.
c: Make an outlet at 165mm distance above the center of two inlets.
d: Put the shower valve against the wall, mark the position of the 4 fixing holes following the plate.
e: Drill 4X8mm holes on the wall to a depth of 45mm and insert wall plugs.
f: Push the shower valve over each pipe. Slide the cover plates against the wall, join inlet elbows to hot/cold pipe from the wall.
For the outlet, follow the same method as the inlet pipes.
g: Finally mount the shower valve onto the wall by using the 4 screws.
2. Install the shower arm (see Fig 2).
3. Finally put the shower head onto the shower arm (see Fig 3).
OUTLET PIPE
COLD INLET
FIXING
COVER
RETAINING
NUT
PLATE
RING
WALL
SCREW
3
3 - 5
WALL
OUTLET PIPE
INLET PIPES
B