Aquasana OptimH2O AQ-RO-3 Instrukcja obsługi - Strona 5
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Systemy filtracji wody Aquasana OptimH2O AQ-RO-3. Aquasana OptimH2O AQ-RO-3 14 stron. Whole house water filter
Również dla Aquasana OptimH2O AQ-RO-3: Instrukcja obsługi (11 strony), Instrukcja obsługi (10 strony), Instrukcja obsługi (16 strony)
2 - INSTALL SYSTEM MANIFOLD
i
Select
an
easily accessible
area
under the sink
to mount system
manifold and remineralizer holder.
You
want to
allow
at
least
a 4
to
6
inch clearance below the filters
to
the floor
to
allow ample
space for filter
changes.
To
help
gauge
the right location for
your
system manifold, insert
first and third
stage
filter
sumps into
manifold.
Insert sumps
by aligning
top connection points and
push up and
to
the right until sumps are locked
in.
V
2
Mark wall placement for mounting
screws using
built-in bracket
on
back of manifold. Make
sure
holes
are as
level
as
possible. Mark
screw
placement of
the remineralizer holder
1
or
2
inches from the third
stage sump
to
the right of the manifold.
3
Drill
two
pilot holes for
mounting brackets using 14"
drill bit for the
system
manifold.
NOTE: Use
caution
not to
drill into anything beyond the cabinet wall.
4 Insert mounting screws into
the wall leaving approximately
%"
of each
screw
exposed.
5 Remove first
and third filter sumps from manifold by turning each
sump
to
the left and
pulling down before hanging manifold
on
wall.
Mount
manifold
on
wall and
screw in. Be
careful
not to over
tighten.
6
Screw in remineralizer holder
onto
wall.
atemjja
1
4
Install the
3/8"
white tubing
to
the tank:
A.
Push the tubing through the
nut,
collar and sleeve
into
the
connector.
B. Unscrew
the compression
nut
from the tank
connector to ensure
that the tubing
is
connected all the
way
through the collar and sleeve.
C.
Slide the
nut to
the threads and tighten with
a
wrench. Avoid
over
tightening.
A