HP 5120 SI Series Instrukcja instalacji - Strona 13
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przełącznik HP 5120 SI Series. HP 5120 SI Series 48 stron. 5120 si switch series
Również dla HP 5120 SI Series: Specyfikacja (33 strony)
Figure 8 Front mounting position (5120 24G PoE+ (370W) SI/5120 48G SI)
1
(1) Front panel
Figure 9 Mid-mounting position (5120 24G PoE+ (370W) SI)
1
(1) Front panel
Figure 10 Rear mounting position (5120 24G PoE+ (370W) SI/5120 48G SI)
1
(1) Front panel
Rack-mounting the switch
This task requires two persons.
To mount the switch in a rack:
1.
Wear an ESD wrist strap and make sure it makes good skin contact and is reliably grounded.
2.
Verify that the rack is reliably grounded and can support the weight of the switch chassis and all
its accessories.
3.
Verify that the mounting brackets have been secured to the switch chassis.
4.
Install cage nuts (user-supplied) in the mounting holes in the rack posts.
5.
One person holds the switch chassis and aligns the oval holes in the brackets with the mounting
holes in the rack posts, and the other person attaches the mounting brackets with M6 screws
(user-supplied) to the rack, as shown in
Figure 11
or
Figure
12.
9