BIOMICROBICS BioBarrier 1.0 Instrukcja instalacji - Strona 8

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla System wodny BIOMICROBICS BioBarrier 1.0. BIOMICROBICS BioBarrier 1.0 13 stron. For use with nsf/ansi std. 40 class i/std. 350 class r, ansi/nsf std. 245
Również dla BIOMICROBICS BioBarrier 1.0: Instrukcja obsługi (7 strony)

BLOWER INSTALLATION

Always have all utility lines and equipment marked by a locating service prior to performing any work. All electrical work
shall be properly performed by a qualified electrician per all applicable codes. Failure to do so could result in severe bodily
injury or death.
The blower housing should be placed on a concrete slab. Both the electrical conduit and air supply line should pass through the
concrete slab from below grade. The electrical supply conduit should be run from the control panel to the desired blower location.
A precast concrete slab can be used by drilling the appropriate holes for the air supply line.
32. Secure blower assembly to base using four (4) 14# x 1½" self-tapping screws (supplied w/ unit). Drill screws
directly into blower base.
33. Connect air line (supplied by contractor) from blower outlet to BioBarrier
INSTALLATION) using required piping (check unit specs). Blower piping to BioBarrier
(12 m) total length and use a maximum of 4 elbows. ALL CONNECTIONS MUST BE AIR-TIGHT AND
PERMANENT. We recommend the use of a union for easy disconnection of the blower piping. Keep all debris
out of air line.
Wire the blower to accept the proper voltage for your specific location according to the diagrams of each
34.
blower.
BLOWER FOR BioBarrier 0.5
CONNECT BLOWER PIPING
a.
Longest pipe
b.
Elbow
c.
Air filter assembly
d.
Shortest pipe
e.
Reducer bushing
USE TEFLON SEALANT TAPE ON
ALL PIPE CONNECTIONS.
unit from step 2 (MODULE
®
may not exceed 40 ft
®