Alpha ESS Smile5-BAT Instrukcja szybkiej instalacji - Strona 6
Przeglądaj online lub pobierz pdf Instrukcja szybkiej instalacji dla Jednostka sterująca Alpha ESS Smile5-BAT. Alpha ESS Smile5-BAT 7 stron. Battery module
Również dla Alpha ESS Smile5-BAT: Instrukcja instalacji (10 strony)

CONFIGURATION with GOODWE INVERTER
GoodWe (EM, ES, SBP series)
The communication cable between INV and BAT is
not regular net cable, it should be as below:
1. If there is only one BAT, DIP switch of BAT should
be as below:
Battery
DIP 1
DIP 1
Position
OFF
ON
one BAT
DIP
DIP 1
DIP 1
Switch
ON
WE
ON
OFF
1 2 3 4
2. If there are two or more than two BAT, DIP switch
of BAT should be as below:
Battery
DIP 1
DIP 1
DIP 1
Position
OFF
OFF
ON
other
BAT
Farthest
OFF
ON
ON
BAT
If there are two or more than two BAT, after connecting the
power cables, please refer to the following the steps:
A. Only connect the communication cable between batteries at the
first. Turn on the batteries and they will get into standby mode
(green light flickering 1s).
B. Until batteries get into work mode (green light flickering 10s)
and then connect the communication cable between BAT and INV.
DIP
DIP 1
Switch
ON
WE
OFF
1 2 3 4
ON
WE
OFF
1 2 3 4