Accumulators AI-CG6-6KTSS Instrukcja instalacji, obsługi i konserwacji - Strona 2
Przeglądaj online lub pobierz pdf Instrukcja instalacji, obsługi i konserwacji dla Sprzęt serwisowy Accumulators AI-CG6-6KTSS. Accumulators AI-CG6-6KTSS 5 stron. Piston accumulator
!
High Pressure Gas in Dangerous!
!
Only a qualified service technician should perform a precharge.
!
Never use oxygen or shop air!
!
Precharge with industrial grade dry nitrogen (N
!
Do not operate an accumulator without a proper nitrogen gas precharge.
!
Release all system hydraulic and pneumatic pressure before attempting any maintenance or service.
!
Use only genuine ACC INC approved charging and gauging equipment for precharging and pressure check.
!
Wear proper eye protection, steel-toed shoes, and take proper safety precautions before attempting any maintenance or service.
1. Description
2. Delivery inspection
3. Installation and mounting
4. Connection
5. Startup and safety
6. Precharging instructions
7. Storage and preservation
8. Disassembly, inspection and assembly
9. Piston accumulator assembly
1.
DESCRIPTION
These installation, operation and care instructions apply to
Accumulators, Inc. piston accumulators only.
Please see the label attached to the accumulator for the
permissible operating pressure, temperature range, seal
elastomer, thread size, and design approval.
For volume, weights, dimensions and other details see our
catalog or visit our website at www.accumulators.com.
DELIVERY INSPECTION
Prior to delivery, Accumulators, Inc. accumulators undergo
a careful inspection to ensure quality and safety. Upon
receipt of the accumulator, please:
1. Inspect for damage sustained during transport. Make
sure to check the gas valve and the hydraulic connection
for any obvious impact damage.
2. Ensure that the details shown on the model code sticker
correspond to the order details.
3. Verify that the test certificates (if required) are present and
correspond to the factory number on the accumulator.
4. The protective cap on the gas valve is tightly closed.
5. The hydraulic connection has been closed off with a
protective plug or plate.
WARNING
!
READ ALL WARNINGS BEFORE PROCEEDING WITH INSTRUCTIONS!
!
FAILURE TO FOLLOW INSTRUCTIONS WILL VOID YOUR WARRANTY!
) gas or better only!
2
WARNING
!
INDEX
3. IN
INSTALLATION AND MOUNTING
Mounting position
Piston accumulators function with maximum effeciency
and longevity when mounted vertically with the gas valve
at the top. There must be sufficient clearance in order to
mount and disconnect the charging and gauging apparatus
to maintain the nitrogen pre-charge.
MOUNTING
In accordance with the recommendations of Accumulators,
Inc., piston accumulators must be securely mounted and
vibration free using approved Accumulators, Inc. clamps and
brackets.
CONNECTION
The connection for the accumulator to the system must
be stress free and torque free, and it must be possible
to isolate the accumulator from the pressurized hydraulic
system.
STARTUP AND SAFETY
STARTUP
Prior to connecting the accumulator to the pressurized
system, the pre-charge pressure should be rechecked (if
the accumulator was pre-charged at Accumulators, Inc. the
pressure level can be found on the pressure tag.)
The level of the pre-charge pressure generally depends on
the following criteria:
•
Type of system
•
Minimum and maximum operating pressures
•
Expected changes in operating temperature
•
Intended function of the accumulator
!
!