3Com 7750 Series Podręcznik użytkownika - Strona 11
Przeglądaj online lub pobierz pdf Podręcznik użytkownika dla Przełącznik 3Com 7750 Series. 3Com 7750 Series 17 stron. Poe power rack
Również dla 3Com 7750 Series: Arkusz danych (12 strony), Instrukcja obsługi produktu (15 strony)
PoE Power Rack Installation Guide
Introduction
This section outlines the sequence for installing the PoE Power Rack, including plug-in modules, as well as
test procedures for verifying the integrity of the installation.
4..1 Guidelines
The device must be installed to allow sufficient front and rear access. All cables must be routed through
insulated conduit openings, All service operation can be completed on the front of the power rack.
4..2 EMI Considerations
When running the DC output cables, ensure that the positive and negative cables are routed so as no loops
are created.
4..3 Installation Tools and Hardware
The following tools and hardware are required to install and test the PoE Power Rack:
#2 Philips screwdriver
Nut driver set or socket set with 10 mm and 13 mm sockets
Adjustable wrench
Digital meter with an accuracy of ± 0.02%
Small and medium flat screw driver
ESD wrist strap
4..4 Safety
Warning
Only qualified personnel can install and service the PoE Power Rack.
Hazardous energy is present in the device and on the interface cables, which can cause electric shock or cause serious injury or death
if safety precautions are ignored. Follow all safety warnings and practices when servicing this equipment.
4..5 Installation Sequence
Review all safety warnings in Section 3 before beginning the installation process. Observe all warnings and
labels on the equipment.
The PoE Power Rack consists of a chassis which includes AC and DC distribution modules, one system
controller, and power supply module bays. Refer to Figures 2-6 and figure 2-7 for relationship of components.
Chapter 4 Installation and Debugging
Chapter 4 Installation and Debugging
4-1