Axor Starck 10050XX1 Instrukcje instalacji / gwarancja - Strona 6
Przeglądaj online lub pobierz pdf Instrukcje instalacji / gwarancja dla Produkt hydrauliczny Axor Starck 10050XX1. Axor Starck 10050XX1 12 stron. Axor - hansgrohe faucet installation instructions / warranty
English
Install the pop-up drain
Remove the plunger.
Unscrew the flange from the tee.
Unscrew the tailpiece from the tee.
Wrap the tailpiece threads with Teflon tape. Install
the tailpiece on the tee.
Install the sealing gasket on the flange.
Rest the flange in the sink outlet.
Install the mack gasket, friction ring and retainer nut
on the flange.
Install the tee and tailpiece on the flange.
Tighten the retainer nut.
Place the plunger in the drain.
Install the ball rod so that the end goes through the
loop in the bottom of the plunger.
Install and hand tighten the pivot ball nut.
Connect the swivel connector to the end of the ball
rod.
Connect the swivel connector to the end of the pull
rod.
Test the drain. Reposition the swivel connector if
necessary.
Tighten the swivel connector screws.
6