Creek Company ODC XR 10 Instrukcja montażu
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Łódź Creek Company ODC XR 10. Creek Company ODC XR 10 6 stron.
ODC XR 10
T T M M
OUTDOOR DISCOVERY CRAFT
T T M
M
ASSEMBLY INSTRUCTIONS
™
Your ODC XR10
Pontoon Boat comes in two separate cartons consisting of the following parts:
ALUMINUM FRAME
(1) Left Frame Member
(1) Right Frame Member
(1) Seat Support Frame Member with Underseat Lift and Lock Anchor System Attached
(2) Foot Bars
(10) Short Snap Pins
(1) Side Storage Pocket
(1) Rigid Grid Cargo Deck with motor mount (with protective bar for shipping attached)
(1) Anchor Line Storage Bag
(1) U-Bar
(1) Rod Holder
(1) Plastic Padded Seat Back
(1) Plastic Padded Seat Bottom
(4) Seat Screws
(2) Seat Assembly Pins
OARS & OARLOCKS
PONTOONS
(1) Pair 8 foot, 3 piece oars
(1) Pair pontoons: Each pontoon consists of
(1) Pair bronze oarlocks, with split rings
30 oz. PVC thermal welded cover, 420 denier nylon
(1) Pair Oar Stops
liner and 30 gauge PVC bladder with valve insert
(2) Oarlock Bushings
and valve plate all pre-assembled.
(8) Cam-lock straps
WARRANTY CARD & PATCH KIT
PUMP
(1)
STRIPPING APRON
Complete with a set of adapters