Cisco Catalyst 3110X Instrukcja instalacji sprzętu - Strona 21

Przeglądaj online lub pobierz pdf Instrukcja instalacji sprzętu dla Przełącznik Cisco Catalyst 3110X. Cisco Catalyst 3110X 48 stron. Catalyst switch module for ibm bladecenter
Również dla Cisco Catalyst 3110X: Podręcznik dla początkujących (31 strony)

Cisco Catalyst 3110X Instrukcja instalacji sprzętu
Chapter 2
Switch Module Installation
Step 7
Slide the switch module into the bay until it stops
Figure 2-2
Step 8
Move the switch module release latch to the closed position. After you insert and lock the switch module,
it turns on, and the power-on self-test (POST) runs to verify that the switch module is operating correctly.
The system power LED blinks green while POST is running and then turns solid green when POST is
finished.
Confirm that the switch module system power LED is green. See the
Step 9
page 1-5
Replace the acoustic-attenuation module, if applicable.
Step 10
To remove the switch module, reverse the installation procedure. Place either another switch module or
a filler module in the blade enclosure bay within 1 minute of removal.

After Installing the Switch Module

After the switch module is installed, you might need to:
OL-12192-01
Installing the Switch Module
C
O
N
S
O
M
L
O
E
!
D
E
M
B
M
R
S
T
LN K
15
AC T
LN K
16
AC T
LN K
17
AC T
LN K
18
AC T
1 ST AC
K 2
for more information about the switch module LEDs.
Configure the switch module with the initial configuration. For instructions, see the switch module
getting started guide on the documentation CD and also on Cisco.com.
Connect the StackWise Plus cables to create a switch stack. See the
section on page 2-6
for more information.
Connect to the switch-module ports. See the
section on page 2-11
and the
Catalyst Switch Module 3110G, 3110X, and 3012 for IBM BladeCenter Hardware Installation Guide
(Figure
2-2).
"Installing Devices in the 10-Gigabit Ethernet Slot"
"Connecting Devices to the Ethernet Ports" section on page
Installing the Switch Module
"Switch Module LEDs" section on
"Creating Switch Stacks"
2-13.
2-5