Sharp SJ-47L-A2G-A2A Instrukcja serwisowa - Strona 21

Przeglądaj online lub pobierz pdf Instrukcja serwisowa dla Lodówka Sharp SJ-47L-A2G-A2A. Sharp SJ-47L-A2G-A2A 32 stron.

Sharp SJ-47L-A2G-A2A Instrukcja serwisowa
(3) Installing of Evaporator
(3)-1. Install Evaporator as shown in Fig. A-16 in the
reverse order of Fig. A-17.
(3)-2. Correct the deformed fin.
NOTE
1. When installing Evaporator, take care not to
deform significantly and break the pipes.
2. Take care not to damage the lead wires and hurt
yourself by the fin of Evaporator.
Mark: Refrigerant flow
Mark: Brazing portion
Hot pipe L
(Side condenser)

COOLING UNIT

Hot pipe
Hot pipe R
(DP-condenser)
(Side condenser)
Figure C-1. Cooling unit
Evaporator
Suction pipe
Eva-pan pipe
Compressor
Dryer
21
SJ-43L-A2
SJ-47L-A2
Back condenser
Capillary tube