Siemens SITRANS LVL200E Instrukcja obsługi - Strona 14

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Przełącznik Siemens SITRANS LVL200E. Siemens SITRANS LVL200E 44 stron. Vibrating switches
Również dla Siemens SITRANS LVL200E: Instrukcja obsługi (40 strony), Instrukcja obsługi (16 strony), Instrukcja obsługi (40 strony)

Siemens SITRANS LVL200E Instrukcja obsługi
Moisture
Transport
14
Fig. 5: Fork position with flange versions
1 Marking with flange version, facing up
Use the recommended cables (see chapter "Connecting to power
supply") and tighten the cable gland.
You can give your instrument additional protection against moisture
penetration by leading the connection cable downward in front of the
cable entry. Rain and condensation water can thus drain off. This ap-
plies mainly to outdoor mounting as well as installation in areas where
high humidity is expected (e.g. through cleaning processes) or on
cooled or heated vessels.
To maintain the housing protection, make sure that the housing lid is
closed during operation and locked, if necessary.
Make sure that the degree of contamination specified in chapter
"Technical data" meets the existing ambient conditions.
Fig. 6: Measures against moisture ingress
Caution:
Do not hold SITRANS LVL200E on the tuning fork. Particularly with
flange or tube versions, the tuning fork can be damaged just by the
weight of the instrument. Transport coated instruments very carefully
and avoid touching the tuning fork.
Remove the packaging or the protective cover just before installation.
SITRANS LVL200E - Operating Instructions
1
MAN-100411