Cisco 2654T6 Instrukcja przepakowywania - Strona 24

Przeglądaj online lub pobierz pdf Instrukcja przepakowywania dla Router sieciowy Cisco 2654T6. Cisco 2654T6 26 stron. Cisco systems router owner's manual

Repackaging the Replaced Router Chassis
Step 7
Step 8
Step 9
Repackaging the Replaced Router Chassis
Note
Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide
A-24
To fasten the two U-shaped side panels together, use
reference and follow these steps.
Starting at one of the top holes on one narrow side panel, align the holes in
a.
the inner and outer corrugated panels.
Open a plastic locking clip by pulling the wedge block out of the clip.
b.
c.
Insert the clip into the hole, then pivot the wedge block into the opening on
the body of the clip and push firmly until it snaps into place, spreading the
butterfly tabs and locking the inner and out side panels together.
Repeat steps
a.
and
d.
Repeat steps
a.
through
e.
Set the corrugated top cap on top of the container side panels and push it down.
Use a strapping machine to wrap two straps end-to-end and two straps side-to-side
over the top of the shipping container to secure it to the pallet.
Your router is now repackaged and ready to be transported. Use a forklift or pallet
jack to move the repackaged router.
This section describes how to repackage a defective chassis to return it to the
factory.
Because the packaging scheme for a bare chassis is very similar to the packaging
scheme for a fully-equipped router, the process for repackaging a bare chassis is
very similar to the process of packaging a fully-equipped router.
c.
for the remaining holes on the narrow side panel.
d.
for the opposite narrow side panel.
Appendix A
Repackaging the Router
Figure A-1 on page A-4
OL-17440-01
as a