CabKing 8V1 Instrukcja obsługi - Strona 8

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Tokarka CabKing 8V1. CabKing 8V1 20 stron.

5. Remove the top nuts and washers located on the four bolts
sticking through the baseboard (FIG. B). Keep these aside, you
will need them for the motor. Remove the plastic protectant
from the baseboard.
6. Install the lamp onto the baseboard. To do this, open the lamp
box and take out the lamp, rubber seal and three Phillips
screws. Using the pre-drilled holes in the baseboard as a
template, secure the lamp with the three Phillips screws,
making sure the rubber seal is between the baseboard and the
lamp. The lamp's power cord needs to be facing away from the
motor (FIG. C).
7. Remove the motor from its box by lifting the motor straight
upwards by its black housing. Do not lift the motor by its shafts.
The motor comes in its own crate for shipping purposes. There
is an included wrench inside the crate. Use this to remove the
nuts that secure the motor in the crate.
8. Once the motor is removed from the crate, place it onto the four
bolts found on the baseboard. Make sure to align the motor so
it is parallel to the board, then take the washer and nuts you
placed aside earlier and tighten them onto the bolts using the
same wrench used to take the motor off the board.
9. Wheel installation — Refer to FIG. D below for step 9. There are two arbors that are
included with your CabKing. The left arbor is located at the end of the left motor shaft.
The right arbor is located at the end of the right motor shaft. Unscrew and remove the
left and right arbors from the motor shafts using the included shaft wrench. Remove
the spacers that are included on the shafts. Install the wheels and spacers onto the
shafts according to FIG. D below. Once the wheels and spacers are properly installed,
replace and tighten the arbors onto the shafts using the shaft wrench.
80#
Left arbor
3-1/2" spacer
220#
280#
3" spacer
600#
2-1/2" spacer
FIG. D
8
FIG. B
FIG. C
3000#
1200
Right arbor
2-1/2" spacer