Argo AWICS19 Instrukcja instalacji - Strona 6

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Klimatyzator Argo AWICS19. Argo AWICS19 18 stron. Split air conditioner system

9 - INSTALLATION PROCEDURE

EN
Minimum operation and maintenance area.
A
150
A
A
1110
Press on the hooks located below the 2 triangle
C
marks on the frame cover and disengage the frame.
ø 65
170
100-150
B
150
250
2000
B
760
AWIBS19
Level
Remove and discard the set screw on the rear panel.
B
The unit can be connected to four directions: right
D
rear - left rear - right side - left side.
Tubing connections from the rear. Check the
E
horizontal position with the level, mark the holes to
be made for the tubes and the screws (see figure
for recommended holes' position).
ø 65
110
50
180
160
6
AWIAS19
Level
105
AWICS19
Level
70
50
ø 80
60