Cisco SCE 1000 and Skrócona instrukcja obsługi - Strona 10
Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Sprzęt sieciowy Cisco SCE 1000 and. Cisco SCE 1000 and 49 stron. Service control engine 1000 2xgbe
Figure 11
Grounding the Unit (DC)
BY PA SS
1
IN
PO W ER
B
OK
IN
1
2
A Grounding kit is provided with each SCE 1000. Use this Grounding kit to properly ground the SCE 1000 chassis.
When installing the unit, the chassis ground connection must always be made first and disconnected last.
On the rear panel of the SCE 1000, locate the chassis grounding connector (refer to the appropriate figure for an AC-
Step 1
or DC-powered SCE 1000 above).
Attach the grounding cable (green and yellow colored cable), firmly fastening the (enclosed) hex nuts and spring
Step 2
washers with a #¼" hex wrench (refer to the appropriate figure for an AC- or DC-powered SCE 1000 above).
The other side of the grounding cable must be connected to the site equivalent of the AC earth.
Connecting the Power
The following sections describe how to reconnect the AC or DC power:
• Connect the DC-Input Power Supply Unit, page 11
• Connect the AC-Input Power Supply Unit, page 12
10
PO W ER A
OK