Cisco SCE 1000 and Skrócona instrukcja obsługi - Strona 38
Przeglądaj online lub pobierz pdf Skrócona instrukcja obsługi dla Sprzęt sieciowy Cisco SCE 1000 and. Cisco SCE 1000 and 49 stron. Service control engine 1000 2xgbe
6
Completing the Installation
This section discusses how to verify link connectivity and how to install a Service Control application.
• Examining the LEDs, page 38
• Final Tests, page 38
• Viewing Configuration, page 39
• Saving the Configuration Settings, page 40
Examining the LEDs
The GBE Link LED must be green to verify that an active connection exists.
The GBE Rx and Tx LEDs (if flashing green) indicate that traffic is being received or transmitted by the SCE 1000 platform,
respectively.
Note that in an inline topology, the Rx and Tx LEDs indicate that packets are being received/transmitted by the SCE 1000
platform.
In optical splitter topologies, the Rx LEDs are the sole indicators. The Tx LEDs do not "blink", since the Tx is not connected
to the port in this topology.
Final Tests
The procedures for performing the final tests to verify that the SCE 1000 is functioning properly are explained in the following
sections.
• Verifying Operational Status, page 38
• Viewing the User Log Counters, page 39
Verifying Operational Status
After all the ports are connected, verify that the SCE 1000 is not in a Warning state.
To verify that the SCE 1000 is not in a warning state, complete the following steps:
On the SCE 1000 Front panel, examine that the Status LED is flashing green.
Step 1
To display the operation status of the system, at the SCE 1000# prompt, type
Step 1
press Enter.
A message displaying the operation status of the system appears. If the system is operating in order, the following
message appears:
System Operation status is Operational.
Example:
The following example displays a sample output where the LEDs appear red/orange:
SCE 1000number show system operation-status System Operation status is Operational
38
show system operation-status
and