Cisco UCS C Series Instrukcja instalacji - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Serwer Cisco UCS C Series. Cisco UCS C Series 19 stron. Security manager 4.3
Również dla Cisco UCS C Series: Wskazówki dotyczące rozwiązywania problemów (11 strony), Instrukcja aktualizacji (11 strony), Instrukcja aktualizacji (10 strony), Skrócona instrukcja obsługi (12 strony), Konfiguracja (10 strony)

Cisco UCS C Series Instrukcja instalacji

Installing the Server in a Rack

• Cisco part UCSC-RAIL-4U-M5= (ball-bearing slide rail kit)
• Cisco part UCSC-CMA-4U-M5= (cable management arm)
Rack Installation Tools Required
The slide rails sold by Cisco Systems for this server do not require tools for installation.
Slide Rail and Cable Management Arm Dimensions
The slide rails for this server have an adjustment range of 24 to 36 inches (610 to 914 mm).
The optional cable management arm (CMA) adds additional length requirements:
• The additional distance from the rear of the server to the rear of the CMA is 5.4 inches (137.4 mm).
• The total length of the server including the CMA is 35.2 inches (894 mm).
Installing the Server in a Rack
Warning
To prevent bodily injury when mounting or servicing this unit in a rack, you must take special
precautions to ensure that the system remains stable. The following guidelines are provided to ensure
your safety:
This unit should be mounted at the bottom of the rack if it is the only unit in the rack.
When mounting this unit in a partially filled rack, load the rack from the bottom to the top with the
heaviest component at the bottom of the rack.
If the rack is provided with stabilizing devices, install the stabilizers before mounting or servicing the
unit in the rack.
Statement 1006
Step 1
Remove the inner rail from the slide rail assembly:
a) Slide out the intermediate and inner slide rails until they click and lock in the fully open position.
b) Hold down the inner rail release clip and at the same time, pull the inner rail free from the assembly.
c) Push down the rail release latch while you collapse the intermediate rail back into the rail assembly.
Installing the Server
4
Installing the Server