Digitus professional DN-170089 Instrukcja szybkiej instalacji - Strona 5

Przeglądaj online lub pobierz pdf Instrukcja szybkiej instalacji dla UPS Digitus professional DN-170089. Digitus professional DN-170089 11 stron. Professional online 1000-3000 va ups system

Note: please refer to user's manual for rackmount installation.

UPS Initial Startup

NOTE
prevent an overload alarm.
1.
Plug the equipment to be protected into the UPS, but do not turn on the protected equipment.
2.
Make any necessary provisions for cord retention and strain relief.
3.
Plug the detachable UPS power cord into the input connector on the UPS rear cover.
4.
Plug the UPS power cord into a power outlet. The UPS front cover display illuminates.
5.
The UPS will do self-test when power on. After that, the charger will charge the battery. If the output
displayed on LCD is "0", there is no output.
6.
Press the combination start up buttons on the UPS front cover for at least half a second. The UPS will start
up and the LED will turn on and off sequentially.
7.
Check the UPS front cover display for active alarms or notices. Resolve any active alarms before continuing.
If the
indicator is on, do not proceed until all alarms are clear.Check the UPS status from the front cover
to view the active alarms. Correct the alarms and restart if necessary.
Please refer to "Troubleshooting" in the user manual.
8.
Verify that the
are powered.
NOTE: At initial startup, the UPS sets system frequency according to input line frequency
(input frequency auto-sensing is enabled by default).
NOTE: At initial startup, please set the output voltage needed before start up the UPS, After
the subsequent startup,the UPS will output the setting voltage.
9.
If you installed an optional EPO, test the EPO function: Activate the external EPO switch. Verify the status
change on the UPS display. Deactivate the external EPO switch and restart the UPS.
NOTE:The internal batteries charge to 80% capacity in less than 5 hours. However, we
recommend that the batteries should be charged for 48 hours after installation or
long-term storage.
Plastic base bracket
FIG.1 The installation for UPS
Verify that the total equipment ratings do not exceed the UPS capacity to
indicator illuminates solid, indicating that the UPS is operating normally and any loads
Plastic base bracket