diLUSSO OV607BBL Instrukcja instalacji i obsługi - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja instalacji i obsługi dla Piekarnik diLUSSO OV607BBL. diLUSSO OV607BBL 14 stron.

diLUSSO OV607BBL Instrukcja instalacji i obsługi
Before connecting to the mains, make sure that:
The electric meter, safety valve, feeding line and socket are adequate to withstand the maximum load
required (refer to product data label for maximum load)
The supply system is regularly earthed, according to the regulations in force.
The isolation switch can easily be reached after the oven is installed.
After connection to the mains, check that the supply cable does not overheat.
Never use reductions, shunts, adaptors that can cause overheating or burning.
The supply cable must be positioned so that it does not exceed 50 C above room temperature at any point
of its length.
The manufacture shall not liable for any direct or indirect damage caused by faulty installation. The installer must
ensure that the product installation and connection complies with the local and general regulation in force.
Installation Instruction
Important!
Unplug the oven before performing installation or maintenance
 Fit the appliance into its surround (beneath a work-top) by inserting screws into the 4 holes that can be
seen in the frame of the oven when the door is open.
Version 1.1
Page 3
Dec 2016