Ariston microSYSTEM 10 RFFI Instrukcja instalacji - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Kocioł Ariston microSYSTEM 10 RFFI. Ariston microSYSTEM 10 RFFI 20 stron. Type c boilers
Również dla Ariston microSYSTEM 10 RFFI: Podręcznik użytkownika (16 strony), Instrukcje serwisowe (24 strony)
T
3.1
ABLE
MODEL
Contract STI 125 Indirect
Comfort STI 125 Indirect
Contract STI 150 Indirect
Comfort STI 150 Indirect
Contract STI 210 indirect
Comfort STI 210 Indirect
Contract STI 300 Indirect
SB 125 Indirect
SB 150 Indirect
SB 200 Indirect
3.2
D
H
OMESTIC
OT
P
K
RIORITY
IT
Boiler
Cylinder
Contract STI 125 Indirect
Comfort STI 125 Indirect
T
3.2
ABLE
4.
COMMISSIONING
4.1
I
P
NITIAL
REPARATION
Technical Data
Capacity
It.
125
125
150
150
200
200
300
125
150
200
W
The microSYSTEM is able to be connected to a specially designed kit for the
ATER
management of D.H.W. production. This kit gives priority to production of D.H.W. unlike
traditional systems where the boiler power is split between C.H. and D.H.W. This
generally enables a smaller storage cylinder to be chosen as the boiler's full output
microSYSTEM
will be channelled into the cylinder allowing for a quick heat-up.
10 RFFI
The kit (ARISTON part number 706329) can be obtained from an ARISTON supplier.
Possible
The kit consits of:
Possible
1) Electronic module able to plug into the boiler's P.C.B;
2) 3-way priority valve with actuator for connection to the boiler's flow outlet;
3) A limit thermostat (80˚C) to check the water temperature of the heating flow to the
cylinder, to be installed within the boiler;
4) Pipes and accessories.
MTS support the
of the
customer, they are shown how to use it, and it is signed by them. Please instruct your
customer that they must have their
contact a service engineer or us.
Preliminary electrical system checks to ensure electrical safety must be carried out
by a competent person i.e. polarity, earth continuity, resistance to earth and short
circuit.
F
ILLING THE
Remove the panels of the case and lower the control panel (see section 3.3 for
further information).
Open the central heating flow and return cocks supplied with the connection kit
(there are two isolation points on the return connection).
Unscrew the cap on the automatic air release valve one full turn and leave open
permanently.
Coil
C.H.W.
Surface
Flow/rate
Flow/rate
m
m
/h
2
3
0.75
0.5
1
2
0.75
0.5
0.93
1
2
0.93
0.5
0.93
1
2
0.93
0.5
0.93
1
2
1
0.5
1
2
1
0.5
1
2
1.3
0.5
1
2
initiative. Within the information pack you will find a copy
Log Book. It is important that this is completed in the presence of your
H
S
:
EATING
YSTEM
14
D.H.W.
Max Heating
Output
It/h
kW
194
11.3
266
15.5
340
19.8
256
14.9
353
20.5
451
26.2
256
14.9
353
20.5
451
26.2
256
14.9
353
20.5
451
26.2
190
11
318
18.5
496
28.8
190
11
318
18.5
496
28.8
190
11
318
18.5
496
28.8
Log Book with them whenever they
Heat Ioss
kWh/24h
2
2.2
2.4
2.9
1.72
1.75
2.1