Aeotec Z-DSB28-ZWUS Instrukcja instalacji - Strona 3

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Przyrządy pomiarowe Aeotec Z-DSB28-ZWUS. Aeotec Z-DSB28-ZWUS 5 stron. Home energy meter

Aeotec Z-DSB28-ZWUS Instrukcja instalacji
3. Connect the clamp to the meter using a Clamp Connector (1). Affix one of the AC Power exposed wires into
a neutral bus terminal and the other exposed wire into a live terminal coming from the main circuit breaker.
Step 2: Place the Home Energy Meter
Inside the meter is a radio antenna used for communications, and this must be taken into consideration when selecting a
location for the meter. If the circuit box is made of metal, it is recommended that the main body of the meter be affixed
outside the circuit box. The Home Energy Meter G2 has been weatherized to the international IP44 standard so that it is
resistant to rain and snow when placed vertically with the wires protruding from the bottom of the unit.
To place the Home Energy Meter:
1. Slip open the backing plate from the back of your meter
2. Affix the plate to the selected wall space using the provided screws
3. Attach your meter to the backing plate.
4. Replace the main circuit box panel.
5. Turn the main breaker back on.
Step 3: Associate the Home Energy Monitor to a Z-Wave network
https://answers.alarm.com/ADC/Partner/Installation_and_Troubleshooting/Energy/Aeon_Labs_Home_Energy_Meter_(HEM)_...
Updated: Wed, 22 Sep 2021 15:05:11 GMT
3