Whirlpool UXT4030ADB0 Instrukcje instalacji oraz instrukcja obsługi i konserwacji - Strona 6
Przeglądaj online lub pobierz pdf Instrukcje instalacji oraz instrukcja obsługi i konserwacji dla Okap wentylacyjny Whirlpool UXT4030ADB0. Whirlpool UXT4030ADB0 24 stron. 30" (76.2 cm) and 36" (91.4 cm) range hood
5. Mark Hole Locations
6. Drill Electrical
Opening
1l
Lift the range hood into place and insert the mounting bracket
tabs through the slots in the back of the range hood.
Using a 11/4"(3 cm) drill bit, drill the hole in the dot marked
previously at the electrical strain relief.
OPTIONAL: Using a 1/8"(3 mm) drill bit, drill pilot holes for the
dots marked previously at each mounting tab at an approximate
45 ° angle in an upward direction.
7. Prepare
Range
Hood
Vents and
Mounting
Tabs
\
Hold the range hood firmly in place with one hand and bend each
mounting tab (A) upward approximately 90 °.
Mark the hole at the power supply knockout (B).
OPTIONAL: Mark the hole in each mounting tab.
Remove the range hood and set it aside.
Install Strain Relief
Install a UL Listed/CSA Approved 1/2"(13 mm) strain relief (A).
Mounting
Tabs
Start a #8-18 x %" (4.2 x 16 ram) truss-head screw into the
mounting tab (C) on each side of the range hood as shown in
the inset. Insert the screws approximately
2 turns into the
mounting tab holes.
Non-vent
(Recirculating)
Installations
Remove the (2) T10 ®tTorx ® screws and remove the top, front
rectangular vent cover (B).
6
1-®TORX and T10 are registered
trademarks
of Acument
Intellectual
Properties, LLC.