ALCOMEXINDO ALUSCAFF S5F-0114-09-MF Instrukcja obsługi - Strona 14

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Sprzęt budowlany ALCOMEXINDO ALUSCAFF S5F-0114-09-MF. ALCOMEXINDO ALUSCAFF S5F-0114-09-MF 18 stron.

13, SPECIAL SAFETY RULES - 6
CAUTION
Always read the relevant user instruction completely before beginning the erection and only then
y
carry out the erection procedures step by step.
5.2
Basic Erection
PRELIMINARY WORK.
Unpack all of the parts of the Alcomexindo Aluminium Sacffolding to be erected and dispose of the
Unpack all of the parts of the Alcomexindo Aluminium Sacffolding to be erected and dispose of the
packaging material according to regulations. Check that all parts of the Alcomexindo Aluminium Scaffolding
are present according to section 5.
Read the erection instruction.
WARNING : never work from or build, or dismantle the tower system from an unguarded platform.
Before finishing work, check that all push-on connections are secured with the proper rung and all spring
interlock clips are engaged correctly.
ame.
(13)
p
y
2. Fit base frame fixed into the base frame
Ensure the hook face outside of the base
frame.( See magnified view )
PLEASE READ THIS INSTRUCTION CAREFULLY BEFORE USE
Copy Right 2012 - By Alcomexindo 021-8831036
g
g
y