Mounting Metal Hanger Bracket to Ceiling
STEP 1
!
supply at the main power box. Disconnect power
by removing fuse or turning off circuit breaker.
OPTION A:
Ceiling Joist
4 timber screws
Install hanger bracket to ceiling joist or concrete ceiling using a minimum of (4) bolts/ screws as provided.
ceiling joists are sound and of adequate size and strength to support a 32Kg (70lbs) load. If a timber frame is to be
added it must be securely nailed or screwed
safety cable within the motor housing opening, approx Ø165mm from the centre of the hanger bracket.
WARNING: MOUNT ONLY TO AN OUTLET BOX MARKED ACCEPTABLE FOR FAN SUPPORT.
This fan is to be installed so that the blades are more than 2.3m above the floor
Connecting Mains Power to Terminal Block
STEP 2
BROWN L
GREEN
BLUE
N
Hook bolt or
timber screw
Expansion bolt or
timber screw
between two beams.
Mount the hook bolt / timber screws for the
L
N
3PIN
CONNECT WITH RECEIVER
OPTION B:
Concrete Ceiling
Ø165mm
4 expansion bolts
FROM HOUSE
(Mains Power)
L LIVE
LIVE
LIVE
GROUND
NEUTRAL
Ensure
4