Zanussi FJS 1025 W Instrukcja obsługi - Strona 9
Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Spryskiwacz Zanussi FJS 1025 W. Zanussi FJS 1025 W 29 stron. Front-load washer
A normal wash cycle consists of the following phases,
Wash - Rinses - Spin and is confirmed by the
illumination of the corresponding LED,s.
To select rinse & spin, press the SKIP button once, the
wash LED goes out.
To select spin only, press the SKIP button twice.
The wash & rinse LED,s go out.
To select Drain, press the SKIP button three times, the
wash - rinse - spin LED,s go out.
If you wish to cancel or advance the running programme
to the required phase, PAUSE the cycle and then press
the SKIP button as previously described.
11 DELAY button
This button makes it possible to delay the starting of the
programme by up to 24 hours. The delay you have
selected is shown on the display for about 3 seconds;
afterwards, the duration of the programme reappears.
You must select this option after you have set the
programme and before you press the START/PAUSE
button.
The time value shown on the display will decrease by
one unit every hour.
You can change the delay time at any moment, before
you press the START/PAUSE button.
If you have already pressed the START/PAUSE button,
and you wish to change or cancel the delay time,
proceed as follows:
• set the washing machine to PAUSE by pressing the
START/PAUSE button;
• press the DELAY button until the display shows the
desired delay time or
• press the DELAY button once, to erase the delay time.
The display will indicate "0h".
• press the START/PAUSE button again.
Important!
The door will be locked throughout the delay time
(DOOR LOCKED light lit).
If you need to open the door, you must first set the
washing machine to PAUSE by pressing the
START/PAUSE button. After you have closed the door,
press the START/PAUSE button again.
12 Programme phase indicator
lights
When you select a programme, the lights relevant to the
phases that form the programme light up.
After you have started the programme, only the light
relevant to the phase that is currently being carried out
will remain lit.
9