Blackberry RADAR-M ITA100-1 Instrukcja instalacji - Strona 14

Przeglądaj online lub pobierz pdf Instrukcja instalacji dla Radar Blackberry RADAR-M ITA100-1. Blackberry RADAR-M ITA100-1 39 stron. Container, dry van, insulated trailers barn doors
Również dla Blackberry RADAR-M ITA100-1: Instrukcja instalacji (27 strony), Instrukcja instalacji (36 strony)

Blackberry RADAR-M ITA100-1 Instrukcja instalacji
14
BLACKBERRY RADAR ITA100-1 CHASSIS BRACKET INSTALLATION GUIDE

3.4 Module installation

You may install the chassis bracket assembly on any flat, vertical surface that offers enough
mounting area for the assembly. When selecting a mounting location, carefully consider
how the asset will be used during its normal, day-to-day operation.
Do not place the assembly in a location where it is susceptible to damage from:
Normal usage activities, such as loading or unloading cargo.
Moving parts of the asset.
Road debris.
IMPORTANT: For accurate tracking, orientation matters.
You must install each hardware module horizontally. Vertically
positioned modules are not supported.
Product must always be installed with the outer surface of the
external module facing the rear of the asset. This will ensure the
system reports the direction of travel, accurately.
This diagram illustrates the proper installation orientation for the chassis bracket assembly.