Displays2go PROMXMN Instrukcja montażu

Przeglądaj online lub pobierz pdf Instrukcja montażu dla Stojaki i stojaki Displays2go PROMXMN. Displays2go PROMXMN 3 stron. Promotional counters

Displays2go PROMXMN Instrukcja montażu
PROMXMN & PROMXMNGR Promotional Counters
Assembly Instructions
Remove the components from the included carrying bag. The kit should include the folded plastic
frame, wooden countertop, two plastic shelves, two aluminum poles and plastic header.
Start by unfolding the plastic frame and positioning it so the sides are at 90 degree angles to the front.
Make sure that metal shelf supports are placed on the inside and the small metal feet are at the bottom.
Next, attach the two shelves to the inside of the display. Hooks on the shelves
connect to the support rails as shown above.