Displays2go LEDDCP Instrukcja montażu - Strona 3
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Gablota Displays2go LEDDCP. Displays2go LEDDCP 6 stron. Illuminated metal pedestal
LEDDCP - Illuminated Metal Pedestal
STEP 1
Place Frame Module (A) on a flat surface. Insert the aluminum bars into the grooves on both sides
of the Frame Module, then fix alu bars by fastening the screws with the wrench (N).
NOTE: DO NOT tighten completely at this point.
Alu. Bar - Top
STEP 2
Insert the Clear Side Panels (E), Black Side Panels (F) to the sides.
Attach Black Bottom Panel (H) to the velcro on the fixed aluminum bars.
Make sure all the panels fit inside grooves and tighten the screws in the aluminum bars that con-
necting with Frame Module (A).
- Middle
Alu. Bar - Top
Frame Module (A)
- Middle
F1
- Bottom
- Bottom
Side Panel-Black F2
3 of 6