Baltimore Aircoil Company TSU 1440D Instrukcja montażu i instalacji - Strona 4

Przeglądaj online lub pobierz pdf Instrukcja montażu i instalacji dla Elektryka przemysłowa Baltimore Aircoil Company TSU 1440D. Baltimore Aircoil Company TSU 1440D 20 stron. Tsu-c-d ice chiller thermal storage unit for external melt

TSU-C-D
1

GENERAL INFORMATION

About Engineering and Application Practices

This bulletin only refers to the assembly of the unit. To ensure a proper operation, a correct integration of the unit in
the overall installation is mandatory. For good engineering and application practices on layout, levelling,
connecting pipework, etc., please refer to our website: http://www.baltimoreaircoil.eu/knowledge-
center/application-information.

Shipping

BAC equipment is factory assembled to assure uniform quality and minimum field assembly.
For the dimensions and weights of a specific unit or section, refer to the certified drawing.

Inspection Before Rigging

When the unit is delivered to the jobsite, it should be checked thoroughly to ensure all required items have been
received and are free of any shipping damage prior to signing the bill of lading.
The following parts should be inspected:
Exterior panels and covers
Ice coils
Sight tube and Ice Logic Ice Quantity controller (optional)
Air pump
Caulking material
The air pump and caulking material are shipped loose in a separate crate.
If shipping damage has occurred, this should be clearly indicated on the CMR.

Unit Weights

Before rigging any BAC equipment, the weight of each section should be verified on the unit certified drawing.
Refer to the Rigging section for weight values.
These weights are approximate only and should be confirmed by weighing before lifting when available
hoisting capacity provides little margin for safety.
4
W W W . B A L T I M O R E A I R C O I L . E U
1 General Information
1 General Information