ClearSpan 104903 Instrukcja montażu - Strona 14
Przeglądaj online lub pobierz pdf Instrukcja montażu dla Zestaw do szklarni ClearSpan 104903. ClearSpan 104903 19 stron. Premium solar star greenhouse
47. Install another section of ridge cap as previously
described.
NOTE: Ridge cap will extend beyond the inside edge of
the roof panels.
48. Attach three 3" x 3" square flat brackets to the
underside surface of each long roof panel in the
locations shown for each panel.
NOTE: Refer to Step 36 for bracket locations if needed.
Short roof panel has been removed to show where to
install the brackets for the long roof panels.
Do not install brackets on the short panels at this time.
49. Install the final long roof panel.
Visit www.ClearSpan.com for additional products and customer assistance.
Ridge Cap
50. Working from inside the greenhouse, attach the last
section of ridge cap between the peaks of the long
roof panels as shown in the follow diagram.
NOTE: This ridge cap section will overlap the installed
ridge cap sections. See dashed line below.
Ridge Cap
51. With all ridge cap sections installed, install the final
short roof panel.
NOTE: The top of the panel is slipped under the ridge
cap and into position.
52. Secure the vented roof panel to the upper roof
support plate and install two square flat brackets to
the underside of the panel to secure the adjacent
panels to the vented panel.
Refer to Step 39 if needed.
13 of 18