ClearSpan 2020SS Podręcznik - Strona 4
Przeglądaj online lub pobierz pdf Podręcznik dla Schronienia ClearSpan 2020SS. ClearSpan 2020SS 18 stron. Add-a-bay shade system
CLEARSPAN
SUNBLOCKER SYSTEM
™
REQUIRED TOOLS
The following list identifies the main tools needed to
assemble the shelter. Additional tools and supports may be
needed depending on the structure, location, and
application.
•
Tape measure or measuring device
•
Variable speed drill and impact driver (cordless with
extra batteries works best)
•
Wrench set or ratchet and socket set (recommended)
•
Hammers, gloves, and eye protection
•
Metal file and metal-cutting saw
•
Ladders, work platforms, and other machinery for lifting
designed to work safely at the height of the shelter
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts before you begin to assemble the shelter.
Unpack the contents of the shipment and place where
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
Verify that all parts listed on the Bill of Materials/Spec
Sheets are present. If anything is missing or you have
questions, consult the Pictorial Parts Guide and all
shelter diagrams for clarification, or contact Customer
Service.
NOTE: At this time, you do not need to open the plastic
bags containing smaller parts such as fasteners or
washers.
QUICK START GUIDE
For an overview of this shelter and to see the main
connection details, consult the diagrams in the Quick Start
Guide located at the back of these instructions.
4
Visit www.ClearSpan.com for additional products and customer assistance.
Space below is reserved for customer notes.
Revision date: 10.04.07