ClearSpan 2040SS Podręcznik - Strona 10
Przeglądaj online lub pobierz pdf Podręcznik dla Schronienia ClearSpan 2040SS. ClearSpan 2040SS 18 stron. Add-a-bay shade system
CLEARSPAN
SUNBLOCKER SYSTEM
™
FRAME ASSEMBLY (CONTINUED)
6. Review the diagrams in the Quick Start section for your
shelter to determine the locations of the remaining
diagonal struts.
Two (2) struts
attached
Three (3) struts
attached
10'-2 3/4
on-center
10'-2 3/4
on-center
Frame length shown may differ from actual frame.
7. Install the diagonal struts. Each corner connection uses
two (2) struts, each mid connections (if present) uses
three (3) struts, and each center connection (if present)
uses four (4) struts. Refer to Quick Start Guide for
location and additional details.
Corner Connection
Center Connection
8. With the struts in position, tighten the band clamps.
9. Once the frame assembly is complete, verify that all
frame bolts are tight, anchor the frame, and install the
cover.
10
Visit www.ClearSpan.com for additional products and customer assistance.
20'-3" on-center
Mid Connection
Space below is reserved for customer notes.
Revision date: 10.04.07