Altron AL-761-N Instrukcja obsługi - Strona 13

Przeglądaj online lub pobierz pdf Instrukcja obsługi dla Urządzenia przemysłowe Altron AL-761-N. Altron AL-761-N 19 stron.

Altron AL-761-N Instrukcja obsługi
unit liquid inlet for any obstructions.
Check the strainer to ensure the tubing is under the liquid level.
Re-start again the Air drawing operation.
Caution:
In case the Electrolysis agent liquid tank is located higher than the
1.
unit, the tank should be moved to a lower position than the unit.

OPERATIONAL STEPS:

How to produce strong electrolyzed water
Connect the grounding wire and connect the AC cable connect to the wall
power outlet and turn on power switch located backside.
Warning:
Make sure the grounding wire is correctly secured
otherwise there is a possibility of an electrical shock
hazard.
Do not handle the AC cable with wet hands otherwise
there is a possibility of an electrical shock hazard.
After the Power is turned on a display will appear as
Turn the diverter position horizontal then turn on tap water. ● Conduct the air drawing
operation. (Refer to air drawing operation on the previous page.)
Continuance Mode
1.
・Press Continuance Mode button or remote switch
(option). Process lamp will turn on and start strong
electrolysis processing.
. Press again the Continuance Mode button or remote
switch (option) for process stop.
Timer Mode
2.
・Please set your required process value by value
button▲▼. (minimum of 0.5 liter, maximum of 60
liters)
・Press Timer Mode button. Process lamp will turn on and start strong electrolysis
processing.
13